Uphill Court consists of 20 high rise buildings comprising 1742 flats with a total construction area of 408,000sq. m. plus 7,000sq. m. of green areas and parking for 3,500 vehicles.  The site work was started in May 2005 and completed, except for the final, central showpiece twin towers, in only 3 years 4 months. The main contractor, Teknik Yapi formed a subsidiary company, Betofiber Yapi, and hired CEMCOTEC to advise on GRC manufacturing techniques, equipment supplier and the factory quality control necessary to ensure that their GRC  met the GRCA’s requirements for Grade 18 GRC, which were easily surpassed during the production of the GRC elements on this project.

The GRC panels were manufactured and erected in only 16 months and consisted of 11,945 window surrounds each approx 4sq.m. of GRC [Total 47,251sq. m.] plus 15,898 decorative elements [19,348sq.m.] making a total of 66, 599sq. m. [1746 tonnes] of GRC.  Initially, production started via premix but, for speed and strength requirements, most were produced via multiple sets of simultaneous chopping spraying equipment.

The project is a shining example of how to use GRC with traditional site-cast reinforced concrete structure to enhance a building appearance.

Roof shot showing cornices & window surrounds
Showing twin-towers centre piece of project
Front Entrance with GRC elements
Window surrounds on building
Premix Surrounds
Twin Towers Only
CEMCOTEC

CEMCOTEC, for all your Glassfibre Reinforced Concrete information.

CEMCOTEC was set up by Graham T Gilbert who has nearly 50 years experience with Glassfibre Reinforced Concrete and now offers this knowledge to the GRC industry.

Graham is active member of the GRCA sitting on the controlling Council as well as the Technical and Marketing Committees.

Contact Us

Cement Composites Technology Ltd
13 Yewdale
Shevington
Wigan
WN6 8DE

Tel: +44 (0) 1257 425 423

Mobile: +44 (0) 777 069 7941